logo
  • Home
  • National
  • Sylhet
    • Moulvibazar
    • Sunamganj
    • Habiganj
  • NRB News
  • UK News
  • International
  • Sports
  • Tourism
  • Entertainment
  • Business
    • Technology
    • Featured
    • Opinion
    • Health
    • Life Style
    • Photo Gallery
    • Sylhet Mirror Team
  • Home
  • National
  • International
  • UK News
  • NRB News
  • Sylhet
  • Sunamganj
  • Moulvibazar
  • Habiganj
  • Business
  • Featured
  • Health
  • Life Style
  • Opinion
  • Entertainment
  • Photo Gallery
  • Sports
  • SUST
  • Technology
  • Tourism
  • Sylhet Mirror Team
  • Contact us
  1. Home
  2. Business
  3. Boeing suffers new 737 Max issue that could delay return

Boeing suffers new 737 Max issue that could delay return


Published: 27 June 2019, 3:25:57

Boeing suffers new 737 Max issue that could delay return

US regulators have uncovered a possible new flaw in Boeing’s troubled 737 Max aircraft that is likely to push back test flights.
The Federal Aviation Administration (FAA) said it identified the “potential risk” during simulator tests, but did not reveal specific details.

Boeing’s top-selling aircraft was grounded in March after two crashes.The company is upgrading the aircraft’s anti-stall software, which is the focus of crash investigators.

In a tweet, the FAA said: “On the most recent issue, the FAA’s process is designed to discover and highlight potential risks. The FAA recently found a potential risk that Boeing must mitigate.”

Last month, the FAA indicated that approval of Boeing’s changes to the 737 Max could come in late June. That would have allowed test flights in early July.

There were initial hopes among airlines that the 737 Max would be back in the air during the summer, but that timetable was pushed back to late this year even before the latest news.

Reuters, which first reported the new issue, said during an FAA pilot simulation in which the stall-prevention system was activated, it took longer than expected to recover the aircraft.

Other sources said the problem was linked to the aircraft’s computing power and whether the processor lacked enough capacity to keep up.Boeing said “we are working closely with the FAA to safely return the Max to service” and that it believed a software fix would address the problem.

But the FAA will be looking into whether it is a hardware issue.

If regulators are unsatisfied with the software fix, the microprocessor unit would have to be replaced and the grounding could stretch on for months longer than previously thought.

The loss of Ethiopian flight ET302 in March was the second fatal accident involving a 737 Max in the space of five months. A near identical aircraft, owned by the Indonesian carrier Lion Air, went down in the sea off Jakarta in October 2018.

Preliminary reports into both accidents have suggested that they were triggered by a flight control system deploying at the wrong time, due to a faulty sensor.

The FAA has been criticised for its lack of oversight and the certification process that cleared the Max to fly.

Earlier this month, Captain Chesley Sullenberger, whose landing of a crippled aircraft on New York’s Hudson River was turned into a Hollywood film, told a Congressional hearing into the 737 Max that the “crashes are demonstrable evidence that our current system of design and certification has failed us”.

Business
Mahmud Hasan Khan elected BGMEA president

Mahmud Hasan Khan elected BGMEA president

World Bank approves $250 million loan to Bangladesh

World Bank approves $250 million loan to Bangladesh

Meta invests in Scale AI, valuing startup at over $29 billion; founder Alexandr Wang to join Meta

Meta invests in Scale AI, valuing startup at over $29 billion; founder Alexandr Wang to join Meta

Oil prices jump over six percent after Israel’s strike on Iran

Oil prices jump over six percent after Israel’s strike on Iran

Latest News
Covid-19: One death, 26 new cases reported in 24hrs
Covid-19: One death, 26 new cases reported in 24hrs
UK supporting Bangladesh in recovery of laundered money: BB governor
UK supporting Bangladesh in recovery of laundered money: BB governor
Gano Forum president Montu dies
Gano Forum president Montu dies
Will perform duties as a referee: CEC
Will perform duties as a referee: CEC
Embracing fatherhood in every sense
Embracing fatherhood in every sense
Messi denied late as Inter Miami, Al Ahly play out scoreless draw in Club World Cup opener
Messi denied late as Inter Miami, Al Ahly play out scoreless draw in Club World Cup opener
Mahmud Hasan Khan elected BGMEA president
Mahmud Hasan Khan elected BGMEA president
Police fire sound grenades at protesting NTRCA job aspirants near Secretariat
Police fire sound grenades at protesting NTRCA job aspirants near Secretariat
5 killed in helicopter crash in India
5 killed in helicopter crash in India
Iranian missile strikes on Israel kill at least 8
Iranian missile strikes on Israel kill at least 8
World Bank approves $250 million loan to Bangladesh
World Bank approves $250 million loan to Bangladesh
Brazil tops player representation in FIFA Club World Cup 2025
Brazil tops player representation in FIFA Club World Cup 2025
New era dawns with 32-team FIFA Club World Cup
New era dawns with 32-team FIFA Club World Cup
Man killed in Habiganj lightning strike
Man killed in Habiganj lightning strike
‘No unfit vehicle will be allowed to ply’
‘No unfit vehicle will be allowed to ply’


© 2023 Sylhetmirror.com All Rights Reserved

Editor : Mohammed Abdul Karim (Goni)
Executive Editor : Enamul Haque Renu

Sylhet Mirror Team

Office: Unit 2, 60 Hanbury Street London E1 5JL Email : sylhetmirror@gmail.com

Developed by: Web Design & IT Company in Bangladesh

Go to top